The Challenge

A manufacturing facility near Munich operated 24/7 with an inefficient heating system that was causing high energy costs and occasional production interruptions due to system failures. The facility needed improvements without disrupting its continuous production schedule.

Our Solution

We designed a phased retrofit solution that included installing industrial-grade smart controllers, heat recovery systems, and our IndustrialHeatOptimizer platform. The system was designed to operate alongside existing equipment until complete transition was possible.

Implementation

The implementation was carefully scheduled around production requirements, with critical work performed during planned maintenance windows. We developed a custom installation schedule that ensured zero impact on production capacity.

Outcome

The facility achieved a 40% improvement in heating efficiency, significant reduction in maintenance costs, and extended the life of existing equipment. The system's predictive maintenance capabilities have prevented two potential system failures that would have resulted in costly production downtime.