
Apartment Complex Modernization
Comprehensive heating system modernization for a 120-unit apartment complex in Berlin, achieving significant CO2 reduction.
Read case studyHow we reduced energy consumption by 35% in a large office complex through smart heating control and optimization.
German Office Complex
15.08.2024
Frankfurt, Germany
Commercial Real Estate
A 20,000 square meter office complex in Frankfurt was facing rising energy costs and inconsistent heating performance across different zones. The building's outdated heating systems were inefficient, leading to high operational costs and tenant complaints about comfort levels.
We implemented our HeatGenius Pro system with AI-driven zone control and predictive maintenance capabilities. The solution included retrofitting existing hardware with smart controllers and deploying our cloud-based management platform.
The implementation was completed over 8 weeks with minimal disruption to tenants. We installed 120 smart thermostats, 40 zone controllers, and 5 central management hubs. Our team provided comprehensive training to the facility management staff.
Within the first heating season, the building achieved a 35% reduction in energy consumption, translating to approximately €45,000 in annual savings. The system paid for itself in just 14 months, and tenant satisfaction scores related to thermal comfort increased by 27%.
Comprehensive heating system modernization for a 120-unit apartment complex in Berlin, achieving significant CO2 reduction.
Read case studyImplementation of AI-driven heating controls across 15 hotel properties, balancing guest comfort with energy efficiency.
Read case studyRetrofitting an aging industrial facility with modern heating management systems while maintaining production schedules.
Read case studyOur energy efficiency experts are ready to analyze your building's heating system and identify opportunities for significant savings.